Safety



Safety

Adequacy NR10 / NR12 / PPRPS

MCK team offers the best tools, equipment, preventive resolutions for your company to work in a safety form, focusing on the risk minimizing from the produced measurement by skilled engineers and technicians to perform the machines maintenance, equipment and automation.

MCK Automação

Our team is qualified to perform a detailed analysis from technical reports in the safety systems of your company, from electrical projects, to mechanical, hydraulic and mechatronic processes, guaranteeing the availability of a safer, healthier and highly productive place with no risks to equipment or employees. We send all the needed documentation with technical report and ART (Brazilian document relate to work safety) sent by a Security Engineer according to requirements of the rules NR10, NR12 and PPRPS.

Risk Reduction Analysis

  • Equipment Identification
  • Existent Risks Identification
  • Risk Category Requirement Definition NBR 14153:2013
  • Risk Quantification HRN
  • Indication of solutions to risk reduction
  • Risk Prioritization Matrix
  • Adequacy Equipment Prioritization Matrix
  • Adequacy Cost Estimative
  • Execution Chronogram

Report and Documentation

  • IEquipment Identification
  • Existent Risk Identifications
  • Risk Category Requirement Definition NBR 14153:2013
  • Risk Quantification HRN
  • Installed systems indication
  • Daily Verification Check list
  • Maintenance Program
  • Electrical Project
  • Operational Training
  • ART sent by an enabled professional

Adequacy Project

  • Electrical Project
  • Mechanical Project
  • Hydraulic Project
  • Pneumatic Project

Inventories

  • Equipment Identification
  • Basic Equipment Evaluation
  • Basic Risk Evaluation
  • Determination of the equipment risk rate
  • Localization in floor plan
  • Equipment Adequacy Prioritization Matrix

Validation

  • Technical Inspection
  • Equipment Identification
  • Existent Risk Identification
  • Risk Category Requirement Definition NBR 14153:2013
  • Risk Quantification HRN
  • Installed System Indications
  • Verification Daily Check list
  • Maintenance Program
  • Mechanical Project
  • Electrical Project
Did not find what you were looking for? Contact our technical team using the form below, and detail your needs to find the best solution for your company.

Other services

Learn about other services that MCK Automação can help your company with.

MCK Automação MCK Automação

Robotic Cells

MCK specializes in the development of automation solutions in general ...

Read More
MCK Automação MCK Automação

Assembly of Panels

MCK has panels in several industries and companies in the Brazilian market ...

Read More
MCK Automação MCK Automação

Robot Programming

MCK has a trained team with extensive knowledge in robot programming ...

Read More

Contact us:

OBS: Fields with (*) are required!